Msc2G7:Joint preparation
From re
Revision as of 13:20, 24 June 2015 by Veronika Laszlo (Talk | contribs)
Joint preparation
PREPARATION INDIVIDUAL PARTS
3D printed structure
Print. Remove support structure Refine the holes with 8mm and 5mm drills.
Axles
Per joint 2 axles need to be made; one 36mm(upper) and the other 52mm(lower). The upper axle (36mm) Holes: 3mm drill. Two holes 4mm from each side. Gap: One little gap at 14mm from the side, rotated ±45degree w.r.t. the holes. The lower axle (52mm) Hole: 3mm drill. One hole 9mm from the right side. Gap: One little gap at 14mm from the left side. Sand both axles down so that they fit through the 5mm bearing.