Msc2G7:Expert5

From re
Jump to: navigation, search


Weekly Planning




12/5 Week 20

NAME TO DO SET ON DUE FINISHED AT
DAVID Consensus Algorithm
MATHIJS Designing Prototype 2 and later

preparations for meeting on multiplicate joints (making this one work +verification)


18/5
EVA

programme V-rap
motor-sensor Arduino programming

RODERICK preparations for meeting

Finetuning motorcontrol

18/5

6/5 Week 19

NAME TO DO SET ON DUE FINISHED AT
DAVID Consensus Algorithm
EVA

Explore V-rap motor-sensor
Arduino programming

MATHIJS Designing Prototype 2 and later
RODERICK Report

Finetuning motorcontrol

6/5 Week 18

NAME TO DO SET ON DUE FINISHED AT
DAVID Consensus Algorithm
MATHIJS Consensus Algorithm

Presentation plenary session


EVA Finetuning motorcontrol prototype
RODERICK Finetuning motorcontrol prototype

22/4 Week 17

NAME TO DO SET ON DUE FINISHED AT
DAVID Consensus Algorithm 20/3 25/3
EVA Matlab-motor programming

Explore V-rap

MATHIJS Designing Prototype 2 and later

plenary session preparation

9/3

20/4


28/4

RODERICK matlab-motor/sensor

week 14, 15, 16

-exam week-
prototype refinement

20/3 Week 13

NAME TO DO SET ON DUE FINISHED AT
DAVID Consensus Algorithm 20/3 25/3 continuing…
EVA Design Prototype 2

Explore V-rap

9/3

20/3

27/3

27/3

continued by Mathijs

improving…

MATHIJS Designing Prototype 2

Write tutorial Calculations

9/3

20/3

27/3

2/4

continuing

small description on 'wiki'

RODERICK UPDATE: Different ways of controlling (gabriel&Chris)

Adapt servos

Computer choices

11/3

16/3 16/3

23/3

25/3

25/3


done
done

16/3 Week 12

NAME TO DO SET ON DUE FINISHED AT
DAVID Preparation Pleniarial Session

Building/Testing prototype 1

9/3

9/3

16/3

18/3

16/3

18/3

EVA Design Prototype 2 9/3 20/3 Delayed
MATHIJS Read Thesis about Consensus Algorithm

Help with Designing Prototype 2

Wiki update

Weight joint

9/3

9/3

16/3

16/3

16/3

20/3

16/3

18/3

N.A.

Delayed

16/3

18/3

RODERICK Different ways of controlling (gabriel&Chris)

Building/Testing prototype 1

Adapt servos

11/3

9/3

16/3

13/3

18/3

23/3

18/3

18/3

9/3 Week 11

NAME TO DO SET ON DUE FINISHED AT
DAVID Preparation Testing

Selection Type of Electrical Motor

Selection Type of Tube

Preparation Pleniarial Session

Building/Testing prototype 1

9/3

9/3

9/3

9/3

9/3

11/3

11/3

13/3

16/3

18/3

16/3

11/3

N.A.

16/3

18/3

EVA Design Prototype 1

Design Prototype 2

9/3

9/3

11/3

20/3

13/3

Delayed

MATHIJS Update all wiki content (joint, front page, weekly planning, etc.)

Write down joint choices + on wiki

Connecting to tube

Worm wheel desicion

Write down prototype choices

Write down Motor Prototype 2 choices + search

Read Thesis about Consensus Algorithm

Help with Designing Prototype 2

9/3

9/3

11/3

11/3

9/3

9/3

9/3

9/3

11/3

13/3

11/3

13/3

13/3

13/3

16/3

20/3

10/3

10/3

13/3

14/3

14/3

13/3

N.A.

Delayed

RODERICK Make Available Motors Work

Figure out 3D printing

Different ways of controlling (gabriel&Chris)

Building/Testing prototype 1

9/3

9/3

11/3

9/3

11/3

11/3

13/3

18/3

10/3

10/3

18/3

18/3


With the support of the Culture Programme of the EU.
EU flag.jpgMETA logo.jpg