Msc2G7:Joint preparation

From re
Revision as of 13:22, 24 June 2015 by Veronika Laszlo (Talk | contribs)

Jump to: navigation, search


Joint preparation


PREPARATION INDIVIDUAL PARTS

1. 3D printed structure

Print. Remove support structure Refine the holes with 8mm and 5mm drills.

2. Axles

Per joint 2 axles need to be made; one 36mm(upper) and the other 52mm(lower).

2.a The upper axle (36mm)

Holes: 3mm drill. Two holes 4mm from each side. Gap: One little gap at 14mm from the side, rotated ±45degree w.r.t. the holes.

2.b The lower axle (52mm)

Hole: 3mm drill. One hole 9mm from the right side. Gap: One little gap at 14mm from the left side. Sand both axles down so that they fit through the 5mm bearing.