Difference between revisions of "Msc2G7:Joint preparation"

From re
Jump to: navigation, search
(Created page with "__NOTOC__ __NOTITLE__ =='''Joint preparation'''== <div style="height:30px; width: 850px; margin:0px; padding: 0px; padding-top: 20px; border: 0px;"> <div style="float:left; ...")
(No difference)

Revision as of 14:20, 24 June 2015


Joint preparation


PREPARATION INDIVIDUAL PARTS

3D printed structure

Print. Remove support structure Refine the holes with 8mm and 5mm drills.

Axles

Per joint 2 axles need to be made; one 36mm(upper) and the other 52mm(lower). The upper axle (36mm) Holes: 3mm drill. Two holes 4mm from each side. Gap: One little gap at 14mm from the side, rotated ±45degree w.r.t. the holes. The lower axle (52mm) Hole: 3mm drill. One hole 9mm from the right side. Gap: One little gap at 14mm from the left side. Sand both axles down so that they fit through the 5mm bearing.