Difference between revisions of "Msc2G7:Joint assembly"
From re
(→Upper assembly) |
(→Upper assembly) |
||
Line 64: | Line 64: | ||
==Upper assembly== | ==Upper assembly== | ||
<br><br> | <br><br> | ||
− | + | <span style="font-sise:14px">The order is crucial.</span> | |
<br><br> | <br><br> | ||
===Step 8=== | ===Step 8=== |
Revision as of 15:04, 24 June 2015
Joint assembly
Lower assembly
Step 1
Step 2
Hold the messing and plastic gear aligned with the bearings. The plastic gear held on top.
Step 3
Slide the axle through the bearing-gear-bearing sandwich, while watching the alignment of the gap.
Step 4
?????
Step 5
When the gap and the little black screw in the messing gear are aligned fasten the screw
Step 6
Put the biggest plastic gear on the potmeter of the ‘down servo’
Step 7
Slide that into the slot on the side
Step 8
Slide in the servo and bolt it down
Upper assembly
The order is crucial.
Step 8
Step 6,7
File:Assembly U6.png