Difference between revisions of "Msc2G7:Joint assembly"
From re
(→Step 5) |
(→Step 1,2,3,4) |
||
Line 78: | Line 78: | ||
===Step 1,2,3,4=== | ===Step 1,2,3,4=== | ||
+ | |||
+ | [[File:Assembly U1.png]] |
Revision as of 14:40, 24 June 2015
Joint assembly
Lower assembly
Step 1
Step 2
Hold the messing and plastic gear aligned with the bearings. The plastic gear held on top.
Step 3
Slide the axle through the bearing-gear-bearing sandwich, while watching the alignment of the gap.
Step 4
?????
Step 5
When the gap and the little black screw in the messing gear are aligned fasten the screw
Step 6
Put the biggest plastic gear on the potmeter of the ‘down servo’
Step 7
Slide that into the slot on the side
Step 8
Slide in the servo and bolt it down
Upper assembly
Step 8
Step 6,7
File:Assembly U6.png