Msc2G7:Joint assembly

From re
Revision as of 14:39, 24 June 2015 by Veronika Laszlo (Talk | contribs)

Jump to: navigation, search


Joint assembly


Lower assembly

Step 1

Assembly L1.png

Step 2

Hold the messing and plastic gear aligned with the bearings. The plastic gear held on top.
Assembly L2.png

Step 3

Slide the axle through the bearing-gear-bearing sandwich, while watching the alignment of the gap.
Assembly L3.png

Step 4

?????

Step 5

When the gap and the little black screw in the messing gear are aligned fasten the screw
Assembly L5.png

Step 6

Put the biggest plastic gear on the potmeter of the ‘down servo’
Assembly L6.png

Step 7

Slide that into the slot on the side
Assembly L7.png

Step 8

Slide in the servo and bolt it down
Assembly L8.png




Upper assembly

Step 8

Assembly U8.png

Step 6,7

File:Assembly U6.png

Step 5

Step 1,2,3,4